TO: Casa Del Mar Homeowners
(If you have tenants, please send this information to them.)
An update …
- Updated work scheduled for 2nd round of maintenance. Start date has been pushed to July 6th lasting about two weeks. Be ready by having all outside walls (including back yards) accessible by moving all items away from the walls giving workers plenty of room to work. Thanks for your help.
Unit 501 Trim at corner of garage West wall window trim 1- 4’x 8’ T-111 siding Belly band trim Fascia at corner of garage Window trim at garage 2nd Story window trim @ garage
Unit 503 Chimney trim Fascia at garage corner 2nd Story fascia corner Siding above garage
Unit 505 Chimney trim and fascia Garage corner fascia
Unit 507 Garage corner fascia Garage window trim
Unit 509 Garage corner fascia East wall window trim x 3 Siding trim Corner 2nd story fascia
Unit 515 Roof sheathing above the electrical panel Siding above electrical panel 2nd Story window trim 2nd Story window trim north wall Siding and trim at the base of chimney
Unit 517 Remove 2nd story trim at the slider and chimney x2
Unit 519 Rear yard siding and trim at slider
Unit 521 Trim and fascia at entry 1st level 2nd level trim a garage corner Garage door trim
Unit 525 Rear trim and chimney siding Upstairs front window trim
Unit 527 Rear fascia
Unit 529 Back side of chimney siding Rear fascia at patio Sheathing 2nd level above entry Fascia at 1st level entry Fascia at garage corner
Unit 531 Garage corner fascia and secondary fascia
Unit 533 Siding below electrical panel repair 2nd fascia at garage corner Rear window trim Fascia above slider 2nd Story fascia and trim at rear
Unit 535 Fascia at entry Rear chimney trim
Unit 541 Cut trim at chimney base Fascia at entry
Unit 545 Trim at slider Siding at base next to slider Fascia above slider Trim at base of chimney Check flashing at chimney Check the chimney stack
Unit 551 Corner fascia 2nd story window trim gable wall Fascia at entry by electrical panel 2 siding epoxy repairs 2nd Story window trim at entry
Unit 553 Repaint repairs Paint chimney trim
Unit 555 2nd Story fascia above splice and Chimney flashing
Unit 559 Garage window trim 1”x4” belly band top and bottom Roof sheathing and fascia at the rear West side window trim Roof sheathing “spongy” remove shingles and replace sheathing re roof after the repair
Unit 534 Fascia at the garage Siding at entry above the plant
Unit 530 Trim at corner of garage base
Unit 526 Remove satellite dish Window trim at the north side
- Once this work is completed, the HOA board is planning on having the asphalt removed and replaced with pavers. This would be an Aug./Sept. timeframe but with the current COVID-19 situation this may change.
- Work will begin shortly on some of the chimneys. More info. soon on which units.
V/r, Tom Kiel
Casa Del Mar HOA President